G3 : A true game changer
G3 is based on a combination of several physical principles and technological means allowing the production of energy from continuously renewable sources.
From 1 KWh and up to 5 MWh per unit which can be deployed on shore (Surface or Underground like abandoned mines) as well as offshore (underwater), with a footprint of a few square meters.
The units come together to form electrical energy production plants ranging from a minimum of 1,08 KWh (25 KWh/day) up to 300 MWh (offshore underwater versions).
Tri-Gen will use the same type of engineering and technologies as the subsea part of the oil platforms and the same type of transportation on site and installation procedures.
Energy production ranges from 100 KWH up to 300 MWh per installation.
G3 TECHNOLOGY PRINCIPLES & PROOF OF CONCEPT WILL BE PRESENTED TO QUALIFIED INVESTORS UNDER NDA
Become an investorG3 TECHNOLOGY PRINCIPLES & PROOF OF CONCEPT WILL BE PRESENTED TO QUALIFIED INVESTORS UNDER NDA
Become an investorMajor characteristics
G3 only needs a small floor space.
G3 power capacity depends on its size (height).
G3 can be sized from to individual needs, like a home or far more power consuming like an industrial park or provide power to a city or to the grid.
Its structure can be hidden (for small and middle size installation) by vegetation, and it can be incorporated directly in new constructions.
G3 can use natural or artificial cliffs, quarries, deep abandoned mines.
G3 operates on shore and off shore : under water (Natural & Artificial lakes, Deep Rivers, Seas and Oceans).
G3 produces energy continuously (no matter, day, night, season, weather), lowering the need for battery storage.
G3 does not produce any heat or radiation during operation.
G3 Operates from -40°C to +65°C.
With G3
No risk of shortage due to bad weather or seasons, or power cuts from your electricity supplier.
Energy produced is not dependent to the day/night cycle, wind speed or season and latitude, neither cold, hot, windy, stormy or sunny weather.
Tri-Gen installation can be paid back within 4 to 7 years - even less, depending on your installation size and energy you spare from your power supplier - on one hand, and the energy you sell to the grid on the other hand.
Protected from energy cost rise or skyrocketing, after repayment period, your sole energy cost is maintenance
EACH G3 LOCAL INSTALLATION IS A FULL POWER PLANT
Contact G3 for more information,
valuation & profitability !
Contact usvaluation & profitability !